生物脫硫設(shè)備冷卻塔的安裝

1.冷卻塔安裝要求

1. Installation requirements of cooling tower
(1)冷卻塔的安裝應(yīng)根據(jù)設(shè)備的各種條件,考慮其安裝位置的地面及其荷載能力,同時也考慮外界條件。
(1) The installation of the cooling tower shall consider the ground and its load capacity at the installation location as well as the external conditions according to various equipment conditions.
(2)安裝時應(yīng)注意冷卻塔的基礎(chǔ)按規(guī)定的尺寸預(yù)埋好水平鋼板,各基礎(chǔ)點(diǎn)的標(biāo)高應(yīng)在同一標(biāo)高的水平面上。
(2) During installation, it shall be noted that the horizontal steel plate shall be embedded in the foundation of the cooling tower according to the specified size, and the elevation of each foundation point shall be on the horizontal plane of the same elevation.
(3)塔體應(yīng)放置水平。水塔在施工安裝時,為防止壓壞底盤,施工人員應(yīng)踏在底盤的加強(qiáng)筋上,在安裝塔外殼、底盤等纖維件時,為防止外殼底盤等變形可先穿螺釘,而后依次逐漸緊固,在確認(rèn)底盤不變形,附近干凈、干燥的條件下,為避免使用時漏水可在接觸處鋪設(shè)纖維氈及涂樹脂。
(3) The tower body shall be placed horizontally. During the construction and installation of the water tower, in order to prevent crushing the chassis, the construction personnel should step on the reinforcing ribs of the chassis. When installing the tower shell, chassis and other fiber parts, in order to prevent the deformation of the shell and chassis, the screws can be threaded first, and then the screws can be tightened gradually. After confirming that the chassis is not deformed, and the surrounding area is clean and dry, the fiber felt and resin can be laid at the contact point to avoid water leakage during use.
2.冷卻塔本體安裝
2. Installation of cooling tower body
冷卻塔不得安裝在通風(fēng)不良和出現(xiàn)濕空氣回流的場合,須安裝在通風(fēng)良好的場所。否則將會降低冷卻塔的冷卻能力。冷卻塔一般安裝在冷凍站的屋頂上,以形成高壓頭,用以克服冷凝器的阻力損失。水泵將需要處理的冷卻水從水池抽出送至冷卻塔,經(jīng)冷卻降溫后從塔底集水盤向下自流壓入冷凝器中,并繼而靠水頭壓差自流入水池,如此循環(huán)。
The cooling tower shall not be installed in the place with poor ventilation and wet air return, but in the place with good ventilation. Otherwise, the cooling capacity of the cooling tower will be reduced. The cooling tower is generally installed on the roof of the refrigeration station to form a high-pressure head to overcome the resistance loss of the condenser. The water pump pumps the cooling water to be treated from the pool to the cooling tower. After cooling, it flows down from the water collecting tray at the bottom of the tower to the condenser automatically, and then flows into the pool automatically by the head pressure difference, so as to circulate.
安裝時,應(yīng)根據(jù)施工圖指明的坐標(biāo)位置就位,并應(yīng)找平找正,設(shè)備要穩(wěn)定牢固,冷卻塔的出水管口及噴嘴方向、位置應(yīng)正確。
During installation, it shall be in place according to the coordinate position indicated in the construction drawing, and shall be leveled and aligned. The equipment shall be stable and firm, and the direction and position of the water outlet and nozzle of the cooling tower shall be correct.
以上就是為大家介紹的有關(guān)生物脫硫的詳細(xì)的介紹,希望對您有所幫助.如果您有什么疑問的話,歡迎聯(lián)系我們.我們將以的態(tài)度,為您提供服務(wù)http://m.086342.com.cn
The above is a detailed introduction of biological desulfurization for you. I hope it will be helpful to you. If you have any questions, please contact us. We will provide you with professional services http://m.086342.com.cn

相關(guān)產(chǎn)品 我們的存在,是為了更好的服務(wù)于沼氣等可燃?xì)怏w凈化及利用行業(yè)
91新搬来的白领女邻居| 欧美激情porn日本一区| 色呦呦精品在线观看中字| 日本色产免费在线视频| 亚洲无码sm在线视频| 国产一区精品毛片| 91人人妻在线| 青青草这里只精品| 美女丝袜视频一区二区三区三州| 欧美成人一级性生活免费在线观看 | 国产情侣欧美色图精选在线| 青青草中文免费一区| 天天搞天天射天天搞| 综合图区欧美网友自拍亚洲| 亚洲av高爱乱美人妻在线| 一本色综合日日| 午夜黄色在线看| 国产欧韩一区二| 大逼被操视频| 中文字幕不卡人妻视频| 久久Aⅴ人妻少妇嫩大尺度| 成人区男人的天| 3P肛交熟妇视频| 成人AV熟女| www.8844日B日B| 欧美精品一区两区三区四区五区| 天天干人人操天天| 久在线大香蕉| 亚洲综合色七久久| 日韩精品99久久久中文字幕| 亚洲色吊丝| 天天干干天天国产| 五月婷婷青青视频在线观看| 淫妻色色综合网| 99欧美精品一区二区黑人| 中文字字幕码一二三区| 中文字幕日韩欧美123| 亚洲AV无码专区国产乱码在线观看 | 久久精品 婷婷 91中心 红桃| 一级片欧美福利| 欧美精产一区二区 AAAAA|